Back in 2014, I presented an entry to mark the 35th anniversary of the opening of the Eastern Suburbs Railway Line in 1979.
It recently turned 40. I look back at the original entry and recognised that there was some clippings that didn't appear in the original post that I had on file.
A good way to mark its 40th birthday.
The article below was from The Sun (June 25, 1979) and reported on teething problems as the line underwent its first peak hour test. The biggest hurdle was bus connections and changes to bus routes, which resulted in missed trains for some.
The Sunday Telegraph (June 24, 1979) was upbeat in its coverage.
The Sun Herald (June 24, 1979) focused on the proceedings at the official opening ceremony and carried an excellent picture of Premier Neville Wran cutting the ribbon.
Source: Stephens, T. 1979. "Century late but Premier still says Eastward Ho!". The Sun Herald, June 24: 5.
The Sydney Morning Herald (June 25) reported that at least 250 000 had traveled on trains on its opening weekend. Overcrowding on board trains and platforms was constant and even delays. Not even adding extra carriages was enough!!!
Showing posts with label Sydney Transport Openings amd Launches. Show all posts
Showing posts with label Sydney Transport Openings amd Launches. Show all posts
Monday, 15 July 2019
Monday, 25 May 2015
SYDNEY TRANSPORT: Captain Cook Bridge Opens (1965)
| The Captain Cook Bridge as seen from Taren Point. The gates to the former punt are still there five decades later. |
On Friday (May 29), it will be fifty years since the Captain Cook Bridge was officially opened. Before 1965, there was only one bridge spanning the Georges River that linked the Sutherland Shire with Sydney - Tom Uglys Bridge at Sylvania. The original three-lane bridge was opened in 1929. Two punts were also in operation. One was downstream at Sans Souci at the end of Rocky Point Road, linking the suburb with Taren Point. There was also the Lugarno Ferry at Lugarno.
The end of World War II fuelled a population boom in the Sutherland Shire. The land was subdivided into new housing estates. By 1961, the region had a population of 112,000. Yet there was one road crossing. At Tom Uglys Bridge, Sylvania motorists were forced to wait in long queues to access the bridge, particularly at weekends. Each lane was carrying as much, if not more, traffic than a typical lane on the Sydney Harbour Bridge.
The St George and Sutherland Shire Leader was first published in 1960, and its lead story on its launch edition on June 29 1960, called for a bridge to replace the punt at Sans Souci. It would form a section of the proposed (and still is) Southern Expressway linking Wollongong with Sydney.
|
|
| Page 1 of the first edition of The St George & Sutherland Shire Leader in June 1960 was calling for a new crossing over the Georges River. |
Source: Anonymous. 1961. "Jumping-off Point". The St George and Sutherland Leader, August 9: 1.
Construction began in 1962. John Holland was named as the winning tender.
Source: Anon. 1962. "New Bridge Goes Up". The St George and Sutherland Shire Leader, July 25: 1.
Here is a photo of construction from 1964 taken by Craig Birdsell as seen from Sylvania.
Source: Birdsell, Craig. 1964. "Untitled (Photograph)."
Just months before opening, the spans met.
Source: Anon. 1965. "Bridging Distance". The Daily Telegraph, January 14: 11.
Below is a rare aerial of the completed bridge and punt taken days prior to the bridge opening.
Source: Anonymous. 1965. "Named for Captain Cook". The Daily Telegraph, May 27, 5.
The bridge was opened to traffic on May 29 1965, after it was officially opened by NSW Governor Sir Eric Woodward. Five thousand people attended. A number of plaques were unveiled. They are located at both ends of the bridge and in the middle of the bridge.
The public was invited to walk over the bridge before motorists could finally use the bridge. In fact, that afternoon, the normally busy Tom Uglys Bridge was deserted as people wanted to see the new road for themselves, leading to significant congestion on the bridge approaches which lasted for the entire weekend.
Source: Anonymous. 1965. "Having a Look at the Bridge". The Daily Telegraph, May 31: 7.
On that same day, the punt operated for the last time before being move upstream to Lugarno where it provided the punt service until 1974, one year after the opening of the Alfords Point Bridge.
I've also included the front page from The Propeller, which I scanned several years back to mark the opening of the bridge.
Updated November 2018 with the addition of a newspaper clipping.
Monday, 29 September 2014
SYDNEY TRANSPORT: Opening of the Gladesville Bridge (1964)
Photo was taken by the Author.
This year the Gladesville Bridge turns 50, and at this stage looks like it will be celebrated with little fanfare. Those who drive over it know little about its engineering feats at the time which makes it a special bridge. Did you know that at the time of completion, it was the longest concrete arched bridge in the world? The longest span is 305 metres while the length of the bridge itself is 579 metres.
But why was the bridge built? It was built to replace a bridge just 300 metres to the west, which would link what is currently Huntleys Point Road at Huntleys Point with Victoria Place at Drummoyne. The bridge itself opened in 1881.
Source: Star Photo Co., Company. Year Unknown.
It could only carry one lane of traffic in each direction plus a tramway. It had a section that could be swung open to enable taller ships to sail through. By the 1950s there were mechanical problems which would stop the bridge from closing. Add in urban growth and increasing use of the car by the growing populace and there was a problem.
| The original Gladesville Bridge struggled to cope with increased traffic movements as this image from 1962 shows. |
Meanwhile, there were plans to build a freeway running west from the Sydney CBD through Gladesville and the North Shore to link what is now the Pacific Motorway (M1) and north-west Sydney (The Castlereagh Freeway which evolved into the current M2 motorway). The bridge itself would form a section of the future freeway like the nearby Tarban Creek bridge which was completed the following year (1965).
Here is how the press covered it all the way back on October 2, 1964, when it was officially opened by Princess Marina. Despite the engineering achievements, it had to compete for attention amongst other news stories at the time. It was reported that 6000 attended the opening before being opened to traffic for peak hour. The Daily Telegraph reported congestion on the bridge and approaches occurring that evening in its paper the following day (October 3).
Source: Anonymous, 1964. "6000 see bridge opened: Ceremony by Marina", The Daily Mirror, October 2: 3.
The Sydney Morning Herald was the only paper that provided special coverage of the opening. It produced a special supplement focusing on road projects in NSW and focused on the bridge itself. I have decided to share an illustration that they produced of its construction.
Source: Anonymous. 1964. "Much Work On Design." The Sydney Morning Herald, October 2: 14.
The original Gladesville Bridge no longer remains but two of the spans remain; one each on each side of the Parramatta River.
| The span itself |
Photo was taken by the Author.
Monday, 23 June 2014
SYDNEY TRANSPORT: Eastern Suburbs Railway Line (1979)
Today is the 35th anniversary of the Official Opening of the Eastern Suburbs Railway Line between Central and Bondi Junction. Four new stations joined the CityRail Network: Martin Place Kings Cross, Edgecliff and Bondi Junction. It was the first rail line in Sydney to have all its stations underground. For the first two years of operation, it was a shuttle service between Central and Bondi Junction. It was connected to the Illawarra Line in 1981 and Redfern also got its underground platforms (11 and 12).
On that day in 1979, it was a Saturday and the Premier Neville Wran had the honours of officially declaring the line open.
Below are two advertisements promoting the opening of the line. For the opening weekend, travel was free. After that a single trip cost between 10 and 30 cents.
The Sydney Morning Herald and The Daily Telegraph reported (above) on June 25 that about 250 000 people took advantage of the opening weekend and free rides. There were long queues at stations and platforms overflowed with people.
Most Sydney newspapers were happy. The Daily Telegraph in its editorial on June 25 praised its completion and its addition to the existing rail network. With the Second Oil Crisis underway, it also highlighted the dependence on the motor car and the need to rely on it when one could not use their car. The Sun was quite similar in its view on June 25. The rail line actually made providing transport to Sydney's east even cheaper to about $1.5 million per year. If the oil crisis continued, the savings could increase. However, The Sydney Morning Herald in its editorial on June 23 was critical, suggesting the Eastern Suburbs did not need it and should have focused on spending on improving public transport in the outer suburbs.
Originally, the line was to extend south from Bondi Junction through to Waverley (Charing Cross), Randwick, the University of NSW and Kingsford. The line was to be built in four stages: Edgecliff (1973), Bondi Junction (1974), Randwick (1976) and Kingsford (1977).
Source: State Political Roundsman. 1967. "$12 million a mile track: Bondi Junction on Rail Route," The Daily Telegraph, March 1: 7.
Rushcutters Bay was originally set to have a station but was axed in 1969. It was deemed unviable due to the construction of the William Street tunnel and "small population". Woollahra was also to get its own railway station but construction stopped in 1976 as part of cost-cutting but locals also objected to having their own station.
The platforms between Edgecliff and Bondi Junction are a reminder of what could have been.
On that day in 1979, it was a Saturday and the Premier Neville Wran had the honours of officially declaring the line open.
Below are two advertisements promoting the opening of the line. For the opening weekend, travel was free. After that a single trip cost between 10 and 30 cents.
Source: Public Transport Commission of New South Wales. 1979. "Be our guests, take a free train ride on the new Eastern Suburbs Railway," The Sun, June 21: 27.
Source: Public Transport Commission of New South Wales. 1979. "Eastern Suburbs Railway Now Open," The Daily Telegraph, June 25, 32.
The Sydney Morning Herald and The Daily Telegraph reported (above) on June 25 that about 250 000 people took advantage of the opening weekend and free rides. There were long queues at stations and platforms overflowed with people.
Most Sydney newspapers were happy. The Daily Telegraph in its editorial on June 25 praised its completion and its addition to the existing rail network. With the Second Oil Crisis underway, it also highlighted the dependence on the motor car and the need to rely on it when one could not use their car. The Sun was quite similar in its view on June 25. The rail line actually made providing transport to Sydney's east even cheaper to about $1.5 million per year. If the oil crisis continued, the savings could increase. However, The Sydney Morning Herald in its editorial on June 23 was critical, suggesting the Eastern Suburbs did not need it and should have focused on spending on improving public transport in the outer suburbs.
Originally, the line was to extend south from Bondi Junction through to Waverley (Charing Cross), Randwick, the University of NSW and Kingsford. The line was to be built in four stages: Edgecliff (1973), Bondi Junction (1974), Randwick (1976) and Kingsford (1977).
Source: State Political Roundsman. 1967. "$12 million a mile track: Bondi Junction on Rail Route," The Daily Telegraph, March 1: 7.
Rushcutters Bay was originally set to have a station but was axed in 1969. It was deemed unviable due to the construction of the William Street tunnel and "small population". Woollahra was also to get its own railway station but construction stopped in 1976 as part of cost-cutting but locals also objected to having their own station.
The platforms between Edgecliff and Bondi Junction are a reminder of what could have been.
Source: Cohen, S. B. 1994. Untitled. accessed June 17, 2014, http://www.oocities.org/trendy_rechauffe/Woollahra_station_site_3DEC94_tset.JPG
By completion in 1979, it was five years behind schedule.
Subscribe to:
Posts (Atom)














%2Bclose%2Bup%2Bof%2Bconstruction.jpg)



